Ce que doit inclure un devis d'assistance à l'installation cRABS

Before buying support for a cRABS delivery, tell the bidder which work the site and its general contractor already own. Ask for a separate price and schedule for each activity offered by the equipment supplier.

Clarify when the supplier’s staff are needed

Record who coordinates the supplier’s arrival, who confirms the site is ready and which work can proceed without the supplier. Ask what happens to the price or schedule if the site dates move.

Agree how the visit closes

List any visit records or outstanding actions the buyer expects, who signs them and whom to contact for follow-up. Include responsibility for return visits and associated charges where applicable.

Image de Barry Liu

Barry Liu

Bonjour, je m'appelle Barry Liu et je suis ingénieur commercial chez QUALIA. Je travaille dans le domaine des équipements de biosécurité de laboratoire depuis 2010 et j'ai réalisé plus de 200 certifications de hottes de biosécurité sur site. Je rédige des articles sur l'évaluation de la filtration de confinement, les générateurs de peroxyde d'hydrogène vaporisé (VHP) et la validation des cycles, ainsi que sur les systèmes de décontamination des effluents.

Actualités connexes

Défiler vers le haut

Nous contacter

Contactez-nous directement : [email protected]