Принятие решения о том, следует ли составлять смету на модернизацию или замену системы cRABS

Ask the line owner to identify what has changed since the current equipment was purchased. A change in supplier support, project schedule or required records may warrant comparing upgrade and replacement offers.

Request scope for both options

For an upgrade, ask the bidder to list work covered and items the site retains. For replacement, ask for the offered unit, included services and site coordination requirements.

Compare how each option reaches handover

Record which organization owns delivery and the buyer’s acceptance documents. Ask each bidder to identify the effects of changes to schedule or scope before comparing its price.

Picture of Barry Liu

Барри Лю

Здравствуйте, я Барри Лю, инженер по продажам в компании QUALIA. С 2010 года я работаю в сфере лабораторного оборудования для биобезопасности и провел более 200 сертификаций биологических шкафов на объектах. Я пишу статьи об оценке фильтрации с ограничением распространения микроорганизмов, генераторах испаренной перекиси водорода (VHP) и валидации циклов, а также о системах обеззараживания сточных вод.

Связанные новости

Интеграция высоких технологий в мобильные лаборатории BSL-3/BSL-4

Узнайте, как высокотехнологичная интеграция позволяет усовершенствовать мобильные лаборатории BSL-3 и BSL-4, обеспечивая повышенную безопасность и эффективность удаленных научных исследований и диагностики. Узнайте о последних инновациях в области проектирования мобильных лабораторий и протоколов биобезопасности.

Фиксированные системы VHP: FAT, SAT, IQ, OQ — формирование документации для передачи объекта

Создайте отслеживаемую цепочку передачи от технического задания (URS) и проектных решений до испытаний, проводимых поставщиками, проверки на объекте, протоколов квалификации, отклонений и итоговой документации.

Прокрутить вверх

Свяжитесь с нами сейчас

Свяжитесь с нами напрямую: [email protected]