수의학 실험실 프로젝트 관련 주장: 설치 증거는 검사 서비스 승인을 의미하지 않는다

An installation and a scientific service are different achievements

A supplier may deliver a bounded equipment package without operating a veterinary testing service. A case study should identify the actual delivery role and should not imply that the equipment company performed or authorized the institution’s scientific work.

Check whose approval is described

An equipment handover record, institutional recognition and a laboratory testing-service authorization have different subjects. A photograph of an installation cannot establish all of them. Unverified project descriptions should not be presented as QUALIA’s completed projects.

Make a proportionate procurement inference

Ask for an authorized description of the seller’s actual work if it matters to selection. Qualified institutional advisers determine the project’s legal and professional requirements. No veterinary testing method, animal research guidance or high-risk capability is supplied here.

Picture of Barry Liu

배리 리우

안녕하세요, 저는 QUALIA의 영업 엔지니어 배리 리우입니다. 2010년부터 실험실 생물안전 장비 분야에서 일해 왔으며, 200건 이상의 현장 생물안전 캐비닛 인증을 수행했습니다. 저는 격리 여과 시스템, 기화 과산화수소(VHP) 발생기 및 사이클 검증, 배출수 오염 제거 시스템에 대한 평가에 관한 글을 쓰고 있습니다.

관련 뉴스

생물학적 안전의 우수성을 실현합니다: 퀄리아의 EPC 역량

정밀성과 신뢰성이 무엇보다 중요한 복잡한 생물안전 및 제약 업계에서, 탁월함을 향한 변함없는 헌신으로 단연 돋보이는 이름이 있습니다. 바로 QUALIA입니다. 생물안전 시스템 솔루션 분야의 선두주자인 QUALIA는 개념적인 아이디어를 완벽하게 가동되는 최첨단 시설로 구현해내는 포괄적인 서비스 패키지를 제공합니다. 다음은 QUALIA의 탁월한 EPC(엔지니어링, 조달, 시공) 역량을 엿볼 수 있는 내용입니다. 비전에서 현실로: 설계 과정 QUALIA의 여정은 프로젝트의 초기 비전과 사양을 꼼꼼하게 정리하는 개념 설계 단계에서 시작됩니다. 이 단계는 전체 프로젝트의 토대를 마련하고, 모든 세부 사항이 고객의 요구 사항과 업계 표준에 부합하도록 보장하기 때문에 매우 중요합니다. 다음으로 기본 설계 단계가 시작되며, 이 단계에서는 상세한 기본 틀이 마련됩니다.

위로 스크롤

지금 문의

직접 문의하세요: [email protected]