{"id":7815,"date":"2026-10-09T03:12:38","date_gmt":"2026-10-08T19:12:38","guid":{"rendered":"https:\/\/qualia-bio.com\/blog\/fixed-vhp-fat-sat-iq-oq-building-the-handover-evidence\/"},"modified":"2026-10-09T03:12:38","modified_gmt":"2026-10-08T19:12:38","slug":"fixed-vhp-fat-sat-iq-oq-building-the-handover-evidence","status":"publish","type":"post","link":"https:\/\/qualia-bio.com\/tr\/blog\/fixed-vhp-fat-sat-iq-oq-building-the-handover-evidence\/","title":{"rendered":"VHP FAT SAT IQ OQ S\u00fcreci: Devir Teslim Kan\u0131tlar\u0131n\u0131n Olu\u015fturulmas\u0131"},"content":{"rendered":"<p>Bir VHP dekontaminasyon d\u00f6ng\u00fcs\u00fc her \u00fcretim s\u00fcrecinden ge\u00e7ebilir, ancak yine de bir denetimi destekleyemeyecek nitelikte bir yeterlilik dosyas\u0131 b\u0131rakabilir. Buradaki eksiklik performansla ilgili de\u011fil; kan\u0131tla ilgilidir. Hangi kay\u0131tlar\u0131n hangi a\u015famaya ait oldu\u011funu ve bunlar\u0131n olu\u015fturulmas\u0131ndan ve onaylanmas\u0131ndan kimin sorumlu oldu\u011funu bilmek, sabit bir VHP sisteminin ger\u00e7ekten devreye al\u0131nmaya haz\u0131r m\u0131 yoksa sadece kullan\u0131ma haz\u0131r m\u0131 oldu\u011funu belirler.<\/p>\n<h2 id=\"traceabilitystartswiththeapprovedursanddesignbasis\">\u0130zlenebilirlik, Onaylanm\u0131\u015f URS ve Tasar\u0131m Temeli ile Ba\u015flar<\/h2>\n<table>\n<thead>\n<tr>\n<th>\u0130zlenebilirlik kalemi<\/th>\n<th>Onaylanm\u0131\u015f gereklilik<\/th>\n<th>Tasar\u0131m temeli<\/th>\n<th>Uygulanabilir FAT, SAT, IQ veya OQ kan\u0131tlar\u0131<\/th>\n<th>Son h\u00fck\u00fcm<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Onaylanm\u0131\u015f her bir URS gereklili\u011fi (her gereklilik i\u00e7in bir sat\u0131r)<\/td>\n<td>Projeye \u00f6zg\u00fc gereksinim tan\u0131mlay\u0131c\u0131s\u0131 ve ifadesi<\/td>\n<td>Destekleyici tasar\u0131m belgesi veya kay\u0131t alt\u0131na al\u0131nm\u0131\u015f tasar\u0131m karar\u0131<\/td>\n<td>\u0130lgili a\u015fama veya a\u015famalarda s\u00f6z konusu gereklili\u011fi kar\u015f\u0131layan kay\u0131t<\/td>\n<td>Uygun oldu\u011fu durumlarda, onaylanm\u0131\u015f sapma, sonu\u00e7, de\u011fi\u015fiklik tetikleyicisi veya yeniden yeterlilik de\u011ferlendirmesi tetikleyicisi<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Bir VHP sistem yeterlilik paketi, ba\u015flang\u0131\u00e7 noktas\u0131 kadar g\u00fcvenilirdir: onaylanm\u0131\u015f kullan\u0131c\u0131 gereksinimleri spesifikasyonu ve buna yan\u0131t veren tasar\u0131m belgeleri. URS\u2019de bir gereksinim bulunmas\u0131na ra\u011fmen tasar\u0131m temelinde buna kar\u015f\u0131l\u0131k gelen bir unsur g\u00f6r\u00fclm\u00fcyorsa, bu gereksinim FAT ba\u015flamadan \u00f6nce zaten kaybolmu\u015f demektir ve daha sonraki hi\u00e7bir test a\u015famas\u0131 bunu telafi edemez. Yeterlilik planlamas\u0131n\u0131n \u015fu a\u015famada ba\u015flayamamas\u0131n\u0131n pratik nedeni budur: <a href=\"https:\/\/qualia-bio.com\/tr\/blog\/what-validation-documents-should-a-containment-equipment-supplier-provide-before-fat-and-sat\/\">FAT veya SAT<\/a> \u2014 o a\u015famaya gelindi\u011finde, belirlenen gereksinimler ya do\u011fru bir \u015fekilde devredilmi\u015f ya da devredilmemi\u015ftir.<\/p>\n<p>Bu yarg\u0131y\u0131 de\u011fi\u015ftiren ko\u015ful, URS\u2019nin kendisinin nas\u0131l yaz\u0131ld\u0131\u011f\u0131d\u0131r. \u0130\u015flevsel sonu\u00e7lar\u0131 test edilebilir terimlerle ifade eden bir URS, tasar\u0131m temelinde yan\u0131t verilebilecek somut bir dayanak sa\u011flar ve FAT, SAT, IQ ve OQ s\u00fcre\u00e7lerine \u201cgereksinimi kar\u015f\u0131lamak\u201d ifadesinin ne anlama geldi\u011fine dair ortak bir referans sunar. Niyetleri belirsiz bir \u015fekilde ifade eden bir URS, tasar\u0131m ekibini ve daha sonra da yeterlilik ekibini ne kastedildi\u011fini yorumlamaya zorlar; bu yorum ise, belirli bir gereksinimin nerede do\u011fruland\u0131\u011f\u0131n\u0131 soran bir denet\u00e7iyle kar\u015f\u0131la\u015ft\u0131\u011f\u0131nda ge\u00e7erlili\u011fini yitirebilir. <a href=\"https:\/\/health.ec.europa.eu\/system\/files\/2016-11\/2015-10_annex15_0.pdf\">EudraLex Ek 15<\/a> URS\u2019yi tasar\u0131m yeterlili\u011fiyle ili\u015fkilendirerek ve bu yeterlili\u011fin varsay\u0131mlara de\u011fil, onaylanm\u0131\u015f ve izlenebilir bir temele dayanmas\u0131n\u0131 \u015fart ko\u015farak bu konuyu do\u011frudan ele almaktad\u0131r.<\/p>\n<p>\u00d6zellikle bir VHP sistemi s\u00f6z konusu oldu\u011funda \u2014 burada d\u00f6ng\u00fc parametreleri, sens\u00f6r yerle\u015fimi, hazne veya muhafaza konfig\u00fcrasyonu ve malzeme uyumlulu\u011funun t\u00fcm\u00fc projeye \u00f6zg\u00fc kararlara dayand\u0131\u011f\u0131ndan \u2014 tasar\u0131m temeli, bu kararlar\u0131n kaydedildi\u011fi ve daha sonraki her testin bu temele g\u00f6re de\u011ferlendirildi\u011fi referans noktas\u0131d\u0131r. Tasar\u0131m\u0131n dondurulmas\u0131ndan sonra bir gereklilik de\u011fi\u015firse, izlenebilirlik kayd\u0131, bu de\u011fi\u015fikli\u011fin FAT, SAT, IQ ve OQ a\u015famalar\u0131na yans\u0131t\u0131ld\u0131\u011f\u0131 ya da sessizce ortadan kayboldu\u011fu yerdir.<\/p>\n<p>Bu a\u015famada al\u0131c\u0131n\u0131n g\u00f6revi, daha fazla belge haz\u0131rlamak de\u011fil; onaylanm\u0131\u015f her bir gereklili\u011fin en az bir yeterlilik a\u015famas\u0131na giden a\u00e7\u0131k bir yolunun oldu\u011funu teyit etmektir. Bir gereksinimin b\u00f6yle bir yolu yoksa, bunu o anda g\u00fcndeme getirmelidir \u2014 ne IQ s\u0131ras\u0131nda ne de d\u00fczenleyici denetim s\u0131ras\u0131nda. Bu ayn\u0131 zamanda, proje ekibinin ama\u00e7lanan kullan\u0131m, yard\u0131mc\u0131 sistemler, oda aray\u00fczleri ve \u00e7al\u0131\u015fma ko\u015fullar\u0131 hakk\u0131nda sa\u011flad\u0131\u011f\u0131 bilgilerin tedarik\u00e7inin konfig\u00fcrasyon veya teklif incelemesine dahil edildi\u011fi noktad\u0131r; \u00e7\u00fcnk\u00fc tedarik\u00e7inin \u00f6nerdi\u011fi tasar\u0131m temeli, bu bilgilerin \u00f6nceden ne kadar eksiksiz bir \u015fekilde tan\u0131mland\u0131\u011f\u0131na ba\u011fl\u0131d\u0131r.<\/p>\n\t\t<div data-elementor-type=\"widget\" data-elementor-id=\"6744\" class=\"elementor elementor-6744\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6744 elementor-align-right elementor-widget elementor-widget-button\" data-id=\"6744\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6IjI1MzMiLCJ0b2dnbGUiOmZhbHNlfQ%3D%3D\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">\u015eimdi Sorgula<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\n<h2 id=\"fatconfirmsconfiguredfunctionsbeforedelivery\">FAT, Teslimattan \u00d6nce Yap\u0131land\u0131r\u0131lm\u0131\u015f \u0130\u015flevleri Do\u011frular<\/h2>\n<table>\n<thead>\n<tr>\n<th>Sahne<\/th>\n<th>Birincil kan\u0131t odak noktas\u0131<\/th>\n<th>Proje karar s\u0131n\u0131r\u0131<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>FAT<\/td>\n<td>Sevkiyat \u00f6ncesinde test edilebilen yap\u0131land\u0131r\u0131lm\u0131\u015f i\u015flevler<\/td>\n<td>Tedarik\u00e7iye ait kan\u0131tlar\u0131 yaln\u0131zca bunun gerek\u00e7elendirildi\u011fi ve \u00f6nceden belirlenmi\u015f proje kriterlerine g\u00f6re de\u011ferlendirildi\u011fi durumlarda kullan\u0131n<\/td>\n<\/tr>\n<tr>\n<td>SAT<\/td>\n<td>Kurulum, tesis altyap\u0131s\u0131, nakliye veya entegrasyondan etkilenen aray\u00fczler ve i\u015flevler<\/td>\n<td>FAT sonucunun bunu kapsad\u0131\u011f\u0131n\u0131 varsaymak yerine, sahaya \u00f6zg\u00fc ko\u015fulu do\u011frulay\u0131n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Fabrika Kabul Testi (FAT), baz\u0131 i\u015flevlerin bir VHP sistemi tedarik\u00e7inin tesisinden ayr\u0131lmadan \u00f6nce do\u011frulanabilmesi nedeniyle uygulan\u0131r; bu i\u015flevlerin erken a\u015famada do\u011frulanmas\u0131, proje ekibinin sahada \u00e7\u00f6zmesi gereken bilinmeyenlerin say\u0131s\u0131n\u0131 azalt\u0131r. FAT kapsam\u0131nda ger\u00e7ekten de\u011ferlendirilmesi gereken i\u015flevler, sistemin al\u0131c\u0131 tesiste nas\u0131l yerle\u015ftirilece\u011fine de\u011fil, ekipman\u0131n kendi yap\u0131land\u0131rmas\u0131na ba\u011fl\u0131 olanlard\u0131r \u2014 kontrol mant\u0131\u011f\u0131, yap\u0131land\u0131r\u0131lm\u0131\u015f parametreler, dahili sens\u00f6r tepkisi, tedarik\u00e7inin test ko\u015fullar\u0131 alt\u0131nda jenerat\u00f6r performans\u0131.<\/p>\n<p>Burada \u00f6nemli olan ayr\u0131m, FAT\u2019\u0131n neleri temsil edebilece\u011fi ve neleri temsil edemeyece\u011fidir. Bir tedarik\u00e7inin test ortam\u0131, bir VHP jenerat\u00f6r\u00fcn\u00fcn, o ortamda mevcut olan \u015febeke kaynaklar\u0131 ve ko\u015fullar sa\u011fland\u0131\u011f\u0131nda yap\u0131land\u0131r\u0131ld\u0131\u011f\u0131 \u015fekilde \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 do\u011frulayabilir. Ancak ayn\u0131 sistemin, projenin ger\u00e7ek \u015febeke kaynaklar\u0131na ba\u011fland\u0131\u011f\u0131nda, al\u0131c\u0131 odan\u0131n havaland\u0131rma veya izleme sistemleriyle entegre edildi\u011finde ya da projenin bu sistem i\u00e7in in\u015fa etti\u011fi fiziksel konuma kuruldu\u011funda nas\u0131l davranaca\u011f\u0131n\u0131 do\u011frulayamaz. Ek 15, SAT\u2019ta ayn\u0131 testin tekrarlanmas\u0131 yerine FAT kan\u0131tlar\u0131n\u0131n kabul edilmesine izin vererek bu durumu dikkate al\u0131r; ancak bu, yaln\u0131zca bu g\u00fcvenin hakl\u0131 oldu\u011fu ve FAT kan\u0131tlar\u0131n\u0131n testten sonra de\u011fil, testten \u00f6nce \u00fczerinde anla\u015fmaya var\u0131lan \u00f6nceden tan\u0131mlanm\u0131\u015f kriterlere g\u00f6re de\u011ferlendirildi\u011fi durumlarda ge\u00e7erlidir.<\/p>\n<p>Bu durum, bir proje ekibinin protokollerini nas\u0131l planlayaca\u011f\u0131 konusunda do\u011frudan bir sonu\u00e7 do\u011furur. FAT kabul kriterleri belirsiz bir \u015fekilde yaz\u0131l\u0131rsa veya testin ger\u00e7ekle\u015ftirilmesinden sonra kabul edilirse, tedarik\u00e7inin FAT kan\u0131tlar\u0131na daha sonra g\u00fcvenmek zorla\u015f\u0131r; \u00e7\u00fcnk\u00fc bir denet\u00e7i veya yeterlilik de\u011ferlendiricisinin, bu kan\u0131tlar\u0131 sahada yap\u0131lan bir testle e\u015fde\u011fer olarak de\u011ferlendirebilece\u011fi belgelenmi\u015f bir dayana\u011f\u0131 olmaz. FAT kriterlerinin \u00f6nceden tan\u0131mland\u0131\u011f\u0131, belirli yap\u0131land\u0131r\u0131lm\u0131\u015f i\u015flevlere ba\u011fland\u0131\u011f\u0131 ve resmi olarak kabul edildi\u011fi durumlarda ise bu kan\u0131tlar, SAT kapsam\u0131nda tekrarlanmas\u0131 gereken i\u015flemleri me\u015fru bir \u015fekilde azaltabilir.<\/p>\n<p>Bu a\u015famada proje ekibinin g\u00f6revi, i\u015flev baz\u0131nda hangi \u00f6\u011felerin ger\u00e7ekten yap\u0131land\u0131rmaya ba\u011fl\u0131 olup sat\u0131c\u0131n\u0131n tesisinde test edilebilir oldu\u011funu, hangilerinin ise FAT a\u015famas\u0131nda hen\u00fcz mevcut olmayan tesis ko\u015fullar\u0131na ba\u011fl\u0131 oldu\u011funu belirlemektir. Bu iki kategorinin birbiriyle kar\u0131\u015ft\u0131r\u0131lmas\u0131, daha sonra SAT\u2019\u0131n gereksiz olup olmad\u0131\u011f\u0131 ya da FAT\u2019\u0131n yetersiz kal\u0131p kalmad\u0131\u011f\u0131 konusunda anla\u015fmazl\u0131klara yol a\u00e7ar.<\/p>\n<h2 id=\"satresolvessiteutilitiesinterfacesandinstallationeffects\">SAT, Tesis Altyap\u0131s\u0131, Aray\u00fczler ve Kurulum Etkilerini \u00c7\u00f6z\u00fcml\u00fcyor<\/h2>\n<p>Tesis Kabul Testi (SAT), FAT\u2019\u0131n do\u011frulayamad\u0131\u011f\u0131 hususlar\u0131 do\u011frulamak amac\u0131yla \u00f6zel olarak tasarlanm\u0131\u015ft\u0131r: VHP sisteminin ger\u00e7ek kurulum yerine yerle\u015ftirildikten, tesisin kendi altyap\u0131s\u0131na ba\u011fland\u0131ktan ve al\u0131c\u0131 tesisin sa\u011flad\u0131\u011f\u0131 aray\u00fczlerle entegre edildikten sonra nas\u0131l davrand\u0131\u011f\u0131. Nakliye, kurulum ve tesise \u00f6zg\u00fc hizmetlere ba\u011flant\u0131, ekipman\u0131n davran\u0131\u015f\u0131n\u0131 de\u011fi\u015ftirebilecek olaylard\u0131r; bu nedenle SAT, FAT\u2019\u0131n farkl\u0131 bir adla tekrarlanmas\u0131 de\u011fildir \u2014 farkl\u0131 bir risk kategorisini hedefler.<\/p>\n<p>Burada \u00f6nem arz eden yard\u0131mc\u0131 programlar, s\u00f6z konusu VHP kurulumunun i\u015flevini yerine getirebilmesi i\u00e7in ihtiya\u00e7 duydu\u011fu her \u015feydir; \u00f6nemli aray\u00fczler ise sistemi odaya, i\u015fleme veya tesisin izleme ve kontrol altyap\u0131s\u0131na ba\u011flayan her \u015feydir. Bir sistemin oda havaland\u0131rmas\u0131, ge\u00e7i\u015f noktalar\u0131 veya tesis d\u00fczeyinde izleme ile entegre edildi\u011fi durumlarda, SAT, sistemin ve aray\u00fczlerinin birle\u015fik davran\u0131\u015f\u0131n\u0131n ilk kez do\u011fruland\u0131\u011f\u0131 yerdir; zira hi\u00e7bir sat\u0131c\u0131 test ortam\u0131 bu kombinasyonu yeniden \u00fcretemez.<\/p>\n<p>SAT\u2019\u0131n kapsam\u0131n\u0131 belirleyen fakt\u00f6r, sistemin i\u015flevlerinin ne kadar\u0131n\u0131n tesise \u00f6zg\u00fc kurulumuna ba\u011fl\u0131 oldu\u011fu ve ne kadar\u0131n\u0131n ise FAT a\u015famas\u0131nda zaten tam olarak test edilebilir durumda oldu\u011fudur. Basit tesisat ba\u011flant\u0131lar\u0131na sahip ve tesis aray\u00fcz\u00fcne ba\u011f\u0131ml\u0131l\u0131\u011f\u0131 asgari d\u00fczeyde olan bir sistemin SAT kapsam\u0131 daha dar olabilir; zira i\u015flevlerinin \u00e7o\u011fu daha \u00f6nce zaten do\u011frulanm\u0131\u015ft\u0131r. Karma\u015f\u0131k oda altyap\u0131s\u0131na entegre edilmi\u015f, kilitleme mekanizmalar\u0131na sahip veya izleme i\u015flevi birden fazla ekipman aras\u0131nda payla\u015f\u0131lan bir sistem ise daha geni\u015f bir SAT kapsam\u0131na sahiptir; \u00e7\u00fcnk\u00fc bu sistemin davran\u0131\u015flar\u0131n\u0131n b\u00fcy\u00fck bir k\u0131sm\u0131 ancak kurulumdan sonra g\u00f6zlemlenebilir hale gelir.<\/p>\n<p>Bu a\u015faman\u0131n tespit etmeyi ama\u00e7lad\u0131\u011f\u0131 pratik risk, FAT\u2019ta do\u011frulanm\u0131\u015f bir i\u015flevin nakliye ve kurulumdan sonra da do\u011frulanm\u0131\u015f durumda kalaca\u011f\u0131 varsay\u0131m\u0131d\u0131r. Ek 15\u2019in gerek\u00e7elendirilmi\u015f FAT g\u00fcvenine verdi\u011fi destek, sahaya ba\u011fl\u0131 i\u015flevlere uzanmaz; bu destek, yaln\u0131zca i\u015flevin kendisinin kurulumdan etkilenmedi\u011fi durumlarda ge\u00e7erlidir. Bir proje ekibi i\u00e7in gerekli disiplin, SAT\u2019\u0131 FAT\u2019\u0131n zaten kapsad\u0131\u011f\u0131 hususlar\u0131 yeniden g\u00f6zden ge\u00e7iren bir formalite olarak de\u011fil, \u00f6zellikle kurulumun etkilerini ve saha aray\u00fczlerini teyit eden bir a\u015fama olarak ele almakt\u0131r.<\/p>\n\t\t<div data-elementor-type=\"widget\" data-elementor-id=\"6744\" class=\"elementor elementor-6744\" data-elementor-post-type=\"elementor_library\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-6744 elementor-align-right elementor-widget elementor-widget-button\" data-id=\"6744\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"#elementor-action%3Aaction%3Dpopup%3Aopen%26settings%3DeyJpZCI6IjI1MzMiLCJ0b2dnbGUiOmZhbHNlfQ%3D%3D\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">\u015eimdi Sorgula<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\n<h2 id=\"iqdocumentstheinstalledandcalibratedsystem\">IQ, kurulmu\u015f ve kalibre edilmi\u015f sistemi belgelemektedir<\/h2>\n<p>Kurulum uygunluk de\u011ferlendirmesi, VHP sisteminin fiili durumunun, \u015fartnameye, \u00e7izimlere ve sipari\u015flere g\u00f6re kar\u015f\u0131la\u015ft\u0131r\u0131lmas\u0131d\u0131r. Bu kar\u015f\u0131la\u015ft\u0131rma, \u00e7izimleri, kurulu bile\u015fenleri, ba\u011flanm\u0131\u015f tesisatlar\u0131 ve kalibrasyon durumunu kapsar; amac\u0131, kurulmas\u0131 planlananlar\u0131n de\u011fil, fiilen kurulmu\u015f olanlar\u0131n belgelenmi\u015f bir referans noktas\u0131n\u0131 olu\u015fturmakt\u0131r.<\/p>\n<p>Bu mutabakat\u0131n, FAT veya SAT\u2019tan ayr\u0131 bir a\u015fama olarak \u00f6nem ta\u015f\u0131mas\u0131n\u0131n nedeni, kurulumun tasar\u0131m amac\u0131ndan, i\u015flevsel ar\u0131zalar de\u011fil, belgeleme eksiklikleri \u015feklinde sapabilmesidir. Bir bile\u015fenin e\u015fde\u011fer bir par\u00e7a ile de\u011fi\u015ftirilmesi, bir tesisat ba\u011flant\u0131s\u0131n\u0131n \u00e7izimdekinden farkl\u0131 bir \u015fekilde y\u00f6nlendirilmesi veya bir kalibrasyonun ba\u015flang\u0131\u00e7ta belirtilenden farkl\u0131 bir referansa g\u00f6re ger\u00e7ekle\u015ftirilmesi \u2014 bunlar\u0131n hi\u00e7biri \u00e7al\u0131\u015fma performans\u0131n\u0131 mutlaka etkilemez, ancak her biri, belgelenmemi\u015fse, onaylanm\u0131\u015f tasar\u0131m temeliyle olan izlenebilirlik zincirini bozar. IQ, bu sapmalar\u0131n tespit edildi\u011fi ve ya belgelenmi\u015f bir gerek\u00e7eyle kabul edildi\u011fi ya da yeterlilik s\u00fcrecine ge\u00e7ilmeden \u00f6nce d\u00fczeltildi\u011fi a\u015famad\u0131r.<\/p>\n<p><a href=\"https:\/\/health.ec.europa.eu\/system\/files\/2016-11\/annex11_01-2011_en_0.pdf\">Ek 11\u2019deki \u015fartlar<\/a> VHP sistemi bilgisayarl\u0131 kontrol\u00fc i\u00e7erdi\u011fi her durumda, izlenebilir kullan\u0131c\u0131 gereksinimleri ve belgelenmi\u015f sistem kay\u0131tlar\u0131 burada ge\u00e7erlidir; zira GMP ile ilgili herhangi bir bilgisayarl\u0131 bile\u015fenin kurulum ve kalibrasyon durumu, fiziksel bile\u015fenlerle ayn\u0131 \u015fekilde mutabakat gerektirir. Kontrol mant\u0131\u011f\u0131, veri i\u015fleme veya denetim izi yap\u0131land\u0131rmas\u0131 kurulu sistemin bir par\u00e7as\u0131 oldu\u011funda, bu yap\u0131land\u0131rman\u0131n belirtilen ve onaylananlarla uyu\u015fup uyu\u015fmad\u0131\u011f\u0131n\u0131 belirleyen a\u015fama IQ'dur; kurulu durumun zaten do\u011fru oldu\u011funu varsayan ve bunun yerine sistemin nas\u0131l davrand\u0131\u011f\u0131n\u0131 test eden OQ de\u011fildir.<\/p>\n<p>Bu mutabakat\u0131n ne kadar zahmetli olaca\u011f\u0131n\u0131 belirleyen fakt\u00f6r, kurulu sistemin kendisinin karma\u015f\u0131kl\u0131\u011f\u0131d\u0131r. Basit bir ba\u011f\u0131ms\u0131z \u00fcnite, mutabakat\u0131 yap\u0131lmas\u0131 gereken daha az bile\u015fene ve tesisat unsuruna sahiptir. Ortak bina tesisatlar\u0131, a\u011fa ba\u011fl\u0131 kontrol sistemleri veya \u00e7ok say\u0131da kalibre edilmi\u015f cihazla entegre bir sistemde mutabakat listesi daha uzundur ve her ek aray\u00fcz, as-built durumunun tasar\u0131m esaslar\u0131ndan sapabilece\u011fi bir ba\u015fka noktad\u0131r. Proje ekibinin g\u00f6revi, IQ kayd\u0131n\u0131n sadece do\u011frulanmas\u0131 en kolay olanlar\u0131 de\u011fil, tasar\u0131m esaslar\u0131nda belirtilen her tesisat unsurunu, bile\u015feni ve kalibre edilmi\u015f cihaz\u0131 kapsad\u0131\u011f\u0131n\u0131 teyit etmektir.<\/p>\n<h2 id=\"oqchallengesoperatinglimitsalarmsandfailureresponses\">OQ: \u00c7al\u0131\u015fma S\u0131n\u0131rlar\u0131, Alarmlar ve Ar\u0131za M\u00fcdahaleleri<\/h2>\n<table>\n<thead>\n<tr>\n<th>OQ zorluk alan\u0131<\/th>\n<th>Protokolde \u00f6nceden tan\u0131mlanmas\u0131 gerekir<\/th>\n<th>Sonuca varmak i\u00e7in gerekli kan\u0131tlar<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u00c7al\u0131\u015fma aral\u0131klar\u0131<\/td>\n<td>Projeye \u00f6zg\u00fc aral\u0131k ile zorlama ve kabul kriterleri<\/td>\n<td>\u0130ncelenen aral\u0131kta elde edilen ham sonu\u00e7lar ve onaylanan sonu\u00e7<\/td>\n<\/tr>\n<tr>\n<td>Alarmlar<\/td>\n<td>Test ko\u015fullar\u0131, beklenen yan\u0131tlar ve kabul kriterleri<\/td>\n<td>Alarm vakalar\u0131, sapmalar ve onaylanm\u0131\u015f sonu\u00e7<\/td>\n<\/tr>\n<tr>\n<td>Kilitleme Sistemleri<\/td>\n<td>Test ko\u015fullar\u0131, beklenen yan\u0131tlar ve kabul kriterleri<\/td>\n<td>Kilitleme denetimi kay\u0131tlar\u0131, sapmalar ve onaylanm\u0131\u015f sonu\u00e7<\/td>\n<\/tr>\n<tr>\n<td>\u0130ptal ve kurtarma senaryolar\u0131<\/td>\n<td>Senaryo, beklenen kesinti ve kurtarma tepkileri ile kabul kriterleri<\/td>\n<td>Senaryo kay\u0131tlar\u0131, sapmalar ve onaylanm\u0131\u015f sonu\u00e7<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><a href=\"https:\/\/qualia-bio.com\/tr\/blog\/operational-qualification-for-vhp-bibo-pass-box-and-apr-door-systems-functions-that-need-evidence\/\">Operasyonel yeterlilik<\/a> Bu a\u015famada, VHP sistemi onaylanm\u0131\u015f \u00e7al\u0131\u015fma aral\u0131klar\u0131, alarm tepkileri, emniyet kilitleri ve iptal ile kurtarma senaryolar\u0131 alt\u0131ndaki davran\u0131\u015flar\u0131 a\u00e7\u0131s\u0131ndan test edilir. IQ, sistemin belirtildi\u011fi \u015fekilde kuruldu\u011funu ve kalibre edildi\u011fini do\u011frularken, OQ ise kurulu sistemin, kas\u0131tl\u0131 olarak s\u0131n\u0131rlar\u0131na zorland\u0131\u011f\u0131nda veya ar\u0131za durumlar\u0131na sokuldu\u011funda da dahil olmak \u00fczere, \u00e7al\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda ger\u00e7ekten ama\u00e7land\u0131\u011f\u0131 gibi davrand\u0131\u011f\u0131n\u0131 teyit eder.<\/p>\n<p>Bu test kategorilerinin her biri, farkl\u0131 t\u00fcrde kan\u0131t gereklilikleri i\u00e7erir. \u00c7al\u0131\u015fma aral\u0131\u011f\u0131 testleri, test edilecek spesifik aral\u0131\u011f\u0131 ve kabul edilebilir bir sonu\u00e7 i\u00e7in kriterleri \u00f6nceden tan\u0131mlayan bir protokol gerektirir \u2014 bir VHP d\u00f6ng\u00fcs\u00fcn\u00fcn parametreleri projeye \u00f6zeldir; bu nedenle kabul kriterleri, genel uygulamalardan varsay\u0131lmak yerine o sisteme \u00f6zel olarak belirlenmelidir. Alarm ve kilitleme testleri ise, tan\u0131mlanm\u0131\u015f tetikleme ko\u015fullar\u0131 ve beklenen bir tepkiyi gerektirir; bu tepki, s\u00f6z konusu ko\u015ful kas\u0131tl\u0131 olarak yarat\u0131ld\u0131\u011f\u0131nda sistemin belirtildi\u011fi gibi tepki verdi\u011fini g\u00f6steren kay\u0131tlarla teyit edilmelidir. \u0130ptal ve kurtarma senaryolar\u0131 i\u00e7in ise ayn\u0131 disiplin daha da geni\u015fletilmelidir: tan\u0131mlanm\u0131\u015f bir senaryo, beklenen bir iptal davran\u0131\u015f\u0131, beklenen bir kurtarma davran\u0131\u015f\u0131 ve her ikisinin de kabul edilebilir olup olmad\u0131\u011f\u0131n\u0131 de\u011ferlendirmek i\u00e7in \u00f6nceden belirlenmi\u015f bir temel.<\/p>\n<p>Bu kategorileri birbirine ba\u011flayan unsur, hi\u00e7birinin gayri resmi olarak do\u011frulanamamas\u0131d\u0131r. Devreye alma s\u0131ras\u0131nda bir operat\u00f6r\u00fcn \u201calarm\u0131n \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131\u201d teyit etmesi, test \u00f6ncesinde kararla\u015ft\u0131r\u0131lan bir kritere g\u00f6re olu\u015fturulan spesifik ko\u015fulu, g\u00f6zlemlenen tepkiyi ve var\u0131lan sonucu g\u00f6steren bir test kayd\u0131yla e\u015fde\u011fer de\u011fildir. Ek 15, \u00f6nceden tan\u0131mlanm\u0131\u015f kabul kriterleri ve belgelenmi\u015f sapmalar gerektirerek bu ayr\u0131m\u0131 vurgulamaktad\u0131r \u2014 OQ s\u0131ras\u0131nda kar\u015f\u0131la\u015f\u0131lan bir sapma, yeterlilik \u00e7al\u0131\u015fmas\u0131n\u0131n ba\u015far\u0131s\u0131zl\u0131\u011f\u0131 anlam\u0131na gelmez, ancak sonucun g\u00fcvenilir kabul edilebilmesi i\u00e7in onaylanm\u0131\u015f bir karar gerektirir.<\/p>\n<p>Gerekli OQ derinli\u011fini belirleyen fakt\u00f6r, sistemin g\u00fcvenlik veya \u00fcr\u00fcn koruma i\u015flevinin ne kadar\u0131n\u0131n statik yap\u0131land\u0131rmaya k\u0131yasla dinamik tepkiye ba\u011fl\u0131 oldu\u011fudur. Koruma i\u015flevi yaln\u0131zca ar\u0131za ko\u015fullar\u0131nda devreye giren bir sistemde, bu ar\u0131za ko\u015fullar\u0131n\u0131n fiilen olu\u015fturulup g\u00f6zlemlenmesi gerekir; zira kontrol mant\u0131\u011f\u0131n\u0131n statik bir incelemesi, dinamik davran\u0131\u015f\u0131 do\u011frulayamaz. VHP d\u00f6ng\u00fclerinin di\u011fer ekipmanlarla etkile\u015fime girdi\u011fi durumlarda \u2014 ge\u00e7i\u015f noktalar\u0131, BIBO aktar\u0131m noktalar\u0131 veya oda d\u00fczeyinde izleme \u2014 OQ kapsam\u0131, bu etkile\u015fimlerin s\u00f6z konusu sistemin yeterlilik de\u011ferlendirmesi kapsam\u0131nda m\u0131 ele al\u0131naca\u011f\u0131na yoksa ayr\u0131 olarak m\u0131 ele al\u0131naca\u011f\u0131na karar vermelidir ve bu s\u0131n\u0131r, varsay\u0131lmak yerine protokolde a\u00e7\u0131k\u00e7a belirtilmelidir.<\/p>\n<h2 id=\"handoverclosesdeviationsrecordsandrequalificationtriggers\">Devir \u0130\u015flemi, Sapmalar\u0131, Kay\u0131tlar\u0131 ve Yeniden Yeterlilik Ko\u015fullar\u0131n\u0131 Kapat\u0131r<\/h2>\n<table>\n<thead>\n<tr>\n<th>Kay\u0131t grubu<\/th>\n<th>Saklanacak devir belgeleri<\/th>\n<th>Karar s\u0131n\u0131r\u0131<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Onaylanm\u0131\u015f protokoller<\/td>\n<td>\u00d6nceden tan\u0131mlanm\u0131\u015f kabul kriterleri ve onaylanm\u0131\u015f test esaslar\u0131<\/td>\n<td>Kesin testler ve kriterler, her projeye g\u00f6re de\u011fi\u015fiklik g\u00f6stermektedir<\/td>\n<\/tr>\n<tr>\n<td>Sapmalar<\/td>\n<td>Onaylanm\u0131\u015f sapma kay\u0131tlar\u0131 ve bunlar\u0131n ilgili sonu\u00e7 veya sonu\u00e7 \u00fczerindeki etkisi<\/td>\n<td>Bir sapma, belgelenmemi\u015f bir istisna yerine onaylanm\u0131\u015f bir \u00e7\u00f6z\u00fcm gerektirir<\/td>\n<\/tr>\n<tr>\n<td>Sorumluluk da\u011f\u0131l\u0131m\u0131<\/td>\n<td>Tedarik\u00e7i taraf\u0131ndan sa\u011flanan kay\u0131tlar ve bunlara ili\u015fkin tesis uygunluk kararlar\u0131<\/td>\n<td>Tedarik\u00e7iye ait kan\u0131tlar, bu sorumluluk a\u00e7\u0131k\u00e7a atanmad\u0131k\u00e7a saha karar\u0131n\u0131n al\u0131nmas\u0131nda belirleyici de\u011fildir<\/td>\n<\/tr>\n<tr>\n<td>Son d\u00f6ng\u00fcye ait kan\u0131tlar<\/td>\n<td>Temsili y\u00fck tan\u0131m\u0131, sens\u00f6r ve g\u00f6sterge yerle\u015fimi, ham veriler ve sonu\u00e7lar<\/td>\n<td>G\u00f6sterge sonu\u00e7lar\u0131, fiziksel \u00f6l\u00e7\u00fcmlerin yerini almaz veya evrensel bir d\u00f6ng\u00fc tan\u0131mlamaz<\/td>\n<\/tr>\n<tr>\n<td>De\u011fi\u015fim ve yeniden nitelendirme<\/td>\n<td>Tan\u0131mlanm\u0131\u015f de\u011fi\u015fiklik veya yeniden nitelendirme tetikleyicileri<\/td>\n<td>Tetikleme ko\u015fullar\u0131, onaylanan proje temeliyle s\u0131n\u0131rl\u0131 kalmaktad\u0131r<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Bir yeterlilik paketi, ancak FAT, SAT, IQ veya OQ s\u0131ras\u0131nda ortaya \u00e7\u0131kan her sapma i\u00e7in onaylanm\u0131\u015f bir \u00e7\u00f6z\u00fcm bulunmas\u0131, her protokol\u00fcn \u00f6nceden tan\u0131mlanm\u0131\u015f kriterleri ve onaylanm\u0131\u015f test esaslar\u0131n\u0131n nihai kay\u0131tta yer almas\u0131 ve tedarik\u00e7i taraf\u0131ndan sa\u011flanan kan\u0131tlarla tesis yeterlilik kararlar\u0131 aras\u0131ndaki s\u0131n\u0131r\u0131n varsay\u0131mlara dayal\u0131 de\u011fil, a\u00e7\u0131k\u00e7a belirtilmesi durumunda tamamlanm\u0131\u015f say\u0131l\u0131r. Belgelenmemi\u015f bir istisna \u2014 kay\u0131tl\u0131 bir gerek\u00e7e olmaks\u0131z\u0131n gayri resmi olarak kabul edilen bir sonu\u00e7 \u2014 yeterlilik paketinin bir denetimi destekleyememesinin en yayg\u0131n nedenidir; \u00e7\u00fcnk\u00fc belgelenmi\u015f bir \u00e7\u00f6z\u00fcm\u00fcn bulunmamas\u0131, denet\u00e7inin anormal bir sonucun neden kabul edilebilir g\u00f6r\u00fcld\u00fc\u011f\u00fcn\u00fc anlamas\u0131 i\u00e7in hi\u00e7bir dayanak b\u0131rakmaz.<\/p>\n<p>Sorumluluk da\u011f\u0131l\u0131m\u0131 \u00f6nemlidir; zira bir tedarik\u00e7i ili\u015fkisi arac\u0131l\u0131\u011f\u0131yla temin edilen ve onaylanan bir VHP sistemi, iki t\u00fcr kay\u0131t olu\u015fturur: tedarik\u00e7inin test edip belgelendirdi\u011fi bilgiler ile tesis onay ekibinin vard\u0131\u011f\u0131 sonu\u00e7lar ve onaylad\u0131\u011f\u0131 hususlar. Tedarik\u00e7i kay\u0131tlar\u0131, tesisin alaca\u011f\u0131 bir karara y\u00f6n verebilir; ancak bu sorumluluk, projenin onay plan\u0131nda a\u00e7\u0131k\u00e7a atanmad\u0131k\u00e7a, bu karar\u0131n yerine ge\u00e7mez. Bu ataman\u0131n net olmad\u0131\u011f\u0131 durumlarda, devir paketinde, g\u00f6r\u00fcn\u00fc\u015fte eksiksiz ancak asl\u0131nda kimin neyi onaylad\u0131\u011f\u0131n\u0131 netle\u015ftirmeyen kay\u0131tlar bulunma riski vard\u0131r.<\/p>\n<p>\u00d6zellikle son d\u00f6ng\u00fcye ili\u015fkin kan\u0131tlar a\u00e7\u0131s\u0131ndan, <a href=\"https:\/\/health.ec.europa.eu\/system\/files\/2022-08\/20220825_gmp-an1_en_0.pdf\">AB GMP Ek 1<\/a> Sterilizasyon veya dekontaminasyon validasyonunun fiziksel \u00f6l\u00e7\u00fcmlere dayand\u0131\u011f\u0131 a\u00e7\u0131k\u00e7a belirtilmi\u015ftir; biyolojik veya kimyasal g\u00f6stergeler uygun oldu\u011fu durumlarda kullan\u0131l\u0131r ve uygun yerlere yerle\u015ftirilir \u2014 g\u00f6sterge sonu\u00e7lar\u0131 fiziksel \u00f6l\u00e7\u00fcmlerin yerini almaz ve her ikisi de tan\u0131mlanm\u0131\u015f, temsili bir y\u00fck\u00fcn yerini almaz. Bir VHP sistemi i\u00e7in devir teslimi dosyas\u0131, kalifikasyon s\u0131ras\u0131nda kullan\u0131lan temsili y\u00fck tan\u0131m\u0131n\u0131, sens\u00f6rlerin ve g\u00f6stergelerin yerle\u015ftirilme yerlerini, kalifikasyon denemelerinden elde edilen ham kay\u0131tlar\u0131 ve bunlardan \u00e7\u0131kar\u0131lan sonu\u00e7lar\u0131 i\u00e7ermelidir; \u00e7\u00fcnk\u00fc d\u00f6ng\u00fc performans\u0131n\u0131n gelecekte yap\u0131lacak bir incelemesi, yaln\u0131zca \u00f6zet raporda belirtilenlere de\u011fil, ger\u00e7ekte neyin test edildi\u011finin yeniden olu\u015fturulabilmesine ba\u011fl\u0131d\u0131r.<\/p>\n<p>Son unsur, bir de\u011fi\u015fiklik de\u011ferlendirmesini veya yeniden yeterlilik de\u011ferlendirmesini tetikleyecek ko\u015fullar k\u00fcmesidir \u2014 y\u00fck konfig\u00fcrasyonunda bir de\u011fi\u015fiklik, oda aray\u00fczlerinde bir de\u011fi\u015fiklik, kontrol sisteminde bir de\u011fi\u015fiklik veya projenin yeterlilik esaslar\u0131nda ilgili olarak belirlenen di\u011fer herhangi bir durum. Bu tetikleyiciler genel nitelikte de\u011fil, onaylanm\u0131\u015f proje esaslar\u0131na \u00f6zeldir; bu nedenle, gelecekteki bir g\u00f6zden ge\u00e7irenin kendi ba\u015f\u0131na \u00e7\u0131kar\u0131mda bulunmas\u0131na b\u0131rak\u0131lmak yerine, devir paketinde a\u00e7\u0131k\u00e7a belirtilmeleri gerekir. \u015eu t\u00fcr ekipmanlar gibi: <a href=\"https:\/\/qualia-bio.com\/tr\/product\/spacevhp\/vhp-hydrogen-peroxide-generator-type-i\/\">VHP hidrojen peroksit jenerat\u00f6r\u00fc<\/a> Belirli bir proje i\u00e7in yap\u0131land\u0131r\u0131lm\u0131\u015f sistem, tam olarak bu kay\u0131t k\u00fcmesine g\u00f6re hizmete girer ve bu kay\u0131t k\u00fcmesinin eksiksizli\u011fi, sistemin daha sonra, yeterlilik temelini haf\u0131zadan yeniden olu\u015fturmaya gerek kalmadan bak\u0131m\u0131n\u0131n yap\u0131labilece\u011fini, de\u011fi\u015ftirilebilece\u011fini veya yeniden yeterlilik de\u011ferlendirmesinden ge\u00e7irilebilece\u011fini belirleyen unsurdur.<\/p>\n<h2 id=\"frequentlyaskedquestions\">S\u0131k\u00e7a Sorulan Sorular<\/h2>\n<p><strong>Q:<\/strong> FAT, SAT, IQ ve OQ protokolleri haz\u0131rlanmadan \u00f6nce hangi hususlar \u00fczerinde mutabakat sa\u011flanmal\u0131d\u0131r?<br \/>\n<strong>A:<\/strong> Onaylanm\u0131\u015f URS, kay\u0131t alt\u0131na al\u0131nm\u0131\u015f tasar\u0131m kararlar\u0131, projeye \u00f6zg\u00fc kabul kriterleri ve tedarik\u00e7i kay\u0131tlar\u0131 ile saha yeterlilik kararlar\u0131 aras\u0131nda net bir ayr\u0131mdan yola \u00e7\u0131k\u0131n. Son d\u00f6ng\u00fc kan\u0131tlar\u0131 i\u00e7in, protokol\u00fcn ama\u00e7lanan sonuca uygun kan\u0131tlar sunabilmesi amac\u0131yla temsili y\u00fck\u00fc ve planlanan sens\u00f6r ile g\u00f6sterge konumlar\u0131n\u0131 da belirleyin.<\/p>\n<p><strong>Q:<\/strong> FAT kan\u0131tlar\u0131 ne zaman saha uygunluk dosyas\u0131na dahil edilebilir?<br \/>\n<strong>A:<\/strong> Test edilen ve yap\u0131land\u0131r\u0131lm\u0131\u015f i\u015flevin ge\u00e7erlili\u011fini korudu\u011fu ve kullan\u0131m\u0131n\u0131n \u00f6nceden tan\u0131mlanm\u0131\u015f proje kriterlerine g\u00f6re hakl\u0131 g\u00f6r\u00fcld\u00fc\u011f\u00fc durumlarda, bu bir gereksinimi kar\u015f\u0131layabilir. Nakliye veya entegrasyondan etkilenen kurulum, yard\u0131mc\u0131 programlar, aray\u00fczler ve i\u015flevler i\u00e7in, FAT sonucunun yeterli olaca\u011f\u0131 varsay\u0131m\u0131 yerine, yine de tesise \u00f6zg\u00fc do\u011frulama yap\u0131lmas\u0131 gerekmektedir.<\/p>\n<p><strong>Q:<\/strong> FAT sonras\u0131nda bir gereksinimde meydana gelen de\u011fi\u015fiklik, izlenebilirlik kayd\u0131nda nas\u0131l i\u015flenmelidir?<br \/>\n<strong>A:<\/strong> Gereksinim-kan\u0131t e\u015fle\u015fmesini g\u00fcncelleyin ve hangi tasar\u0131m belgelerinin, testlerin, sonu\u00e7lar\u0131n veya yeniden onay tetikleyicilerinin etkilendi\u011fini belirleyin. Devir paketi, de\u011fi\u015fikli\u011fi ve onaylanm\u0131\u015f karar\u0131n\u0131 korumal\u0131d\u0131r; b\u00f6ylece orijinal FAT kayd\u0131, test edilmemi\u015f bir durum i\u00e7in kan\u0131t olarak de\u011ferlendirilmez.<\/p>\n<p><strong>Q:<\/strong> Bir sapman\u0131n devir teslim s\u0131ras\u0131nda kabul edilebilir olup olmad\u0131\u011f\u0131na kim karar vermelidir?<br \/>\n<strong>A:<\/strong> Protokol, bu sorumlulu\u011fu a\u00e7\u0131k\u00e7a atamal\u0131 ve s\u00f6z konusu sonu\u00e7 veya sonuca ba\u011fl\u0131 olarak onaylanm\u0131\u015f bir i\u015flem yap\u0131lmas\u0131n\u0131 \u015fart ko\u015fmal\u0131d\u0131r. Bir tedarik\u00e7i sapma kayd\u0131, ya\u015fananlar\u0131 belgeleyebilir; ancak bu yetki a\u00e7\u0131k\u00e7a atanmad\u0131k\u00e7a, bu kay\u0131t tesisin yeterlilik karar\u0131 olarak de\u011ferlendirilmemelidir.<\/p>\n<p><strong>Q:<\/strong> G\u00f6sterge sonu\u00e7lar\u0131 tek ba\u015f\u0131na bir VHP d\u00f6ng\u00fcs\u00fcn\u00fcn kabul edilebilir oldu\u011funu g\u00f6sterir mi?<br \/>\n<strong>A:<\/strong> Hay\u0131r. G\u00f6sterge sonu\u00e7lar\u0131, fiziksel \u00f6l\u00e7\u00fcmlerin yerini almaz veya evrensel bir d\u00f6ng\u00fc olu\u015fturmaz. Sonu\u00e7, onaylanm\u0131\u015f proje kriterlerine uygun olmal\u0131 ve temsili y\u00fck tan\u0131m\u0131, sens\u00f6r ve g\u00f6sterge yerle\u015fimi, ham kay\u0131tlar, sapmalar ile nihai onaylanm\u0131\u015f sonucu i\u00e7ermelidir.<\/p>","protected":false},"excerpt":{"rendered":"<p>URS ve tasar\u0131m kararlar\u0131ndan ba\u015flayarak tedarik\u00e7i testleri, saha do\u011frulamas\u0131, yeterlilik protokolleri, sapmalar ve nihai kay\u0131tlara kadar izlenebilir bir devir teslimi olu\u015fturun.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"n8n_meta_description":"","footnotes":""},"categories":[21],"tags":[],"class_list":["post-7815","post","type-post","status-publish","format-standard","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/posts\/7815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/comments?post=7815"}],"version-history":[{"count":1,"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/posts\/7815\/revisions"}],"predecessor-version":[{"id":7816,"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/posts\/7815\/revisions\/7816"}],"wp:attachment":[{"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/media?parent=7815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/categories?post=7815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/qualia-bio.com\/tr\/wp-json\/wp\/v2\/tags?post=7815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}